░░░░░░░ Login to view SqFt Total Building Size
░░░ Contact Us to subscribe to our data service MW Total Power
Facility Details:
Distance | Site | About |
---|---|---|
1.01 miles | Colocation America - Boston | |
1.02 miles | ColoSpace Marlborough | |
1.02 miles | TierPoint Marlborough |
Single story with concrete masonry walls
Raised floor design supports 150+ watts/sq ft
Office Space
Certifications: SSAE 16 SOC1 & SOC2, Type II
|
1.14 miles | Menlo: 34 St Martin |
|
1.15 miles | Crown Castle Marlborough |
|
1.86 miles | 365 Marlborough, MA |
|
2.55 miles | Iron Mountain Boston |
BOS-1 security includes background-checked Iron Mountain officers on-site 24x7x365, three-factor access controls, mantraps, and numerous other features.
|
11.64 miles | Crown Castle Worcester |
|
11.64 miles | Level3 Worchester I | |
17.16 miles | Equinix Boston BO1 | |
17.27 miles | Cyxtera Waltham BO1 |
Datacenter operational since in 1998.
2 story building
Raised Floor: 12"
Utility: NSTAR
|
17.27 miles | 600 Winter - Digital Realty |
Digital Realty full leased the building to a Triple Net tenant, Cyxtera BO1.
|
17.27 miles | Cyxtera Waltham BO2 |
1 Story structure
Utility: NSTAR
|
17.31 miles | Cyxtera Waltham BO3 |
1 Story Structure
Raised Floor: 24"
|
17.31 miles | 115 2nd - Digital Realty |
Digital Realty full leased the building to a Triple Net tenant, Cyxtera BO3
|
19.11 miles | 105 Cabot - Digital Realty |
3 Story Structure
Flood Zone: Outside 100 and 500 Year Flood Plain
Seismic Zone 2A
|
19.14 miles | 128 1ST - Digital Realty |
Originally built by a telecom company in 2000, this facility has 13 MW of critical IT load that serves a total of 18 customers who are primarily internet based, financial services, and healthcare related companies.
|
In 2019, Partners Healthcare rebranded to Mass General Brigham