T5 Northlake IL

Northlake

Operated by:

Map and Nearby Locations:

Northlake
Click Map to begin Search

Sites within 15 miles of T5 Northlake IL

Show SqM
Distance Site About
0.86 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
1.14 miles Aligned Chicago ORD-01
1.15 miles Aligned ORD-02
1.25 miles Microsoft Chicago Northlake
1.99 miles SingleHop Chicago
1.99 miles 9333 Grand Ave (DRT)
2.00 miles 9355 Grand Ave
2.05 miles Tierpoint Chicago West
2.05 miles 9377 Grand Ave
2.08 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
4.57 miles DataBank (ORD4) Oak Brook
4.57 miles XO (Swift Dr)
4.57 miles LexusNexis Oak Brook
4.74 miles Lumen Broadview
5.31 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
5.37 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
5.40 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
5.40 miles XO: (Oak Brook)
5.40 miles US Signal Oakbrook
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
5.53 miles NYI Chicago (Oak Brook)
6.08 miles Cyxtera Elk Grove CH3
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
6.22 miles 2299 Busse (CH2) Digital Realty
6.32 miles Rackspace Elk Grove ORD1
6.32 miles 2200 Busse Rd (CH1) DRT
6.33 miles ColoCrossing CH1
6.33 miles ServerCentral CH1
6.33 miles Digital Elk Grove Village Campus
6.39 miles 1450 E Devon Ave (CH3) DRT
6.43 miles EdgeConneX CHI01
6.43 miles Edgeconnex Chicago Campus
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
6.47 miles Iron Mountain Chicago
Iron Mountain is planning a (but not yet constructed facility in Chicago.)
6.51 miles EdgeConneX CHI02
6.51 miles Stream Chicago II
6.55 miles Equinix Chicago CH3
6.56 miles Stream Chicago I
6.65 miles Skybox Chicago I
7.11 miles CoreWeave: US Central ORD1
7.12 miles STACK Chicago CHI01
7.19 miles STACK Chicago CHI02
7.48 miles Digital Fortress: Chicago Lombard
7.48 miles 360TCS-Lombard
7.67 miles NTT Chicago CH1
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
8.07 miles Prime Elk Grove
8.25 miles Equinix Chicago CH7
8.26 miles Verizon Chicago (Downers Grove)
8.34 miles CyrusOne Chicago Lombard
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
8.38 miles T5 Chicago II
8.41 miles CenturyLink: Arlington Heights
8.50 miles CloudHQ Mount Prospect ORD3
11.14 miles DataBank ORD3 Mount Prospect
11.14 miles Colocation America CH3
11.89 miles Metro Edge: Illinois Medical District (IMD)
12.82 miles QTS Chicago
The campus was a former Sun Times Press Facility and was acquired in 2014
12.96 miles Evoque Lisle CH1
12.96 miles Lumen Chicago 2
13.04 miles Lumen Chicago 4
13.10 miles Complete Source Schaumburg
13.36 miles TierPoint Chicago Polk
13.38 miles Lumen Chicago 1
13.38 miles GTT - 111 North Canal
13.38 miles First Communications Chicago
13.53 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
13.53 miles DataBank (ORD2) 840 S Canal
13.53 miles Lumen Chicago 6
13.63 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
13.67 miles Lumen Chicago 3
13.70 miles Cogent: 216 W Jackson
13.84 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
13.84 miles GTT - 717 South Wells
13.84 miles Colo@ Chicago
13.84 miles Atlantic Metro ORD3
13.84 miles Crown Castle 725 S Wells
13.84 miles Steadfast Chicago 725 Wells
13.84 miles 725 S Wells - 1547 Critical Systems
1547 Acquired the site in December of 2018.
13.88 miles QuadraNet Chicago
13.88 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
13.88 miles InfoRelay Chicago
13.88 miles Cogent: 427 S LaSalle
13.88 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
13.92 miles XO: 140 S Dearborn
13.98 miles Colocation America CH2
13.98 miles Cogent: 600 S Federal
13.98 miles Lumen Chicago 5
13.98 miles 600 S Federal - Digital Realty
14.91 miles Equinix Chicago CH1, CH2, & CH4
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
14.91 miles Steadfast Chicago 350 E Cermak
14.91 miles Cyxtera Chicago CH2
Within DRT's Cermak carrier hotel
14.91 miles 350 E Cermak - Digital Realty
14.91 miles Cyxtera Chicago CH4
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
14.91 miles Colocation America CH1
14.91 miles Atlantic Metro ORD0
14.93 miles ServerCentral Chicago DRT-CH1
14.94 miles test99
15.01 miles Cogent Naperville
16.33 miles 1547 Chicago Midway Technology Centre
16.37 miles Microsoft Hoffman Estates 1
16.45 miles Microsoft Hoffman Estates 2
17.08 miles NetSource Chicago
18.40 miles New Continuum: 603 Discovery
19.34 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
19.73 miles CyrusOne Chicago Aurora CME
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.

T5 Northlake IL Data Center Photos

Operating Company

T5 Data Centers, an Atlanta-based data center provider that specializes in offering wholesale data center space. T5 has data centers in Atlanta, Charlotte, Colorado, Dallas, Los Angeles, and New York markets

12 Facilities Owned
12 Markets Served
66.45 Megawatts
View Company

News

Read More News