1.41 miles
|
8100 Boone - Digital Realty
|
|
1.42 miles
|
Cogent Vienna
|
|
1.66 miles
|
Level3 McLean 1
|
|
1.66 miles
|
DataBank McLean IAD2
|
|
1.87 miles
|
Equinix Vienna DC7
|
|
1.91 miles
|
Element Critical VA1
|
|
4.09 miles
|
XO Fairfax
|
|
4.87 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
4.87 miles
|
ANEXIO Reston
|
|
4.99 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
5.17 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
5.80 miles
|
InfoRelay Reston
|
|
6.87 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
6.87 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
7.21 miles
|
Level3 Reston 1
|
|
7.30 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
7.71 miles
|
Equinix DC97
|
|
7.86 miles
|
Lincoln Rackhouse 251 Exchange
|
|
7.88 miles
|
Cogent: 510 Huntmar
|
|
7.98 miles
|
Level3 Washington (Herndon 1)
|
|
8.62 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
9.49 miles
|
XO (4301 Connecticut)
|
|
9.97 miles
|
45900 Pathfinder Plz
|
|
9.99 miles
|
AWS: 45930 Pathfinder Plz
|
|
10.14 miles
|
Amazon 13600 EDS Drive
|
|
10.15 miles
|
AWS: 45950 Pathfinder Plz
|
|
10.17 miles
|
InfoRelay Herndon
|
|
10.29 miles
|
AWS: 22900 Platform Plz
|
|
10.57 miles
|
Cyxtera IAD2-A
|
|
10.57 miles
|
AWS: 22868 International Dr
|
|
10.60 miles
|
Cyxtera IAD2-B
|
|
10.67 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
10.67 miles
|
AWS: 22945 International Dr
|
|
11.22 miles
|
CyrusOne Sterling VIII
|
|
11.24 miles
|
XO: 1120 Vermont
|
|
11.24 miles
|
Vantage VA2 Campus
|
|
11.25 miles
|
Level3 Washington
|
|
11.25 miles
|
Cogent: 1120 Vermont
|
|
11.29 miles
|
Cyxtera Sterling DC4
|
|
11.29 miles
|
Cyxtera Sterling DC2
|
|
11.31 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
11.31 miles
|
CoreSite DC2
|
|
11.38 miles
|
Amazon IAD-51
|
|
11.41 miles
|
Amazon IAD-56
|
|
11.41 miles
|
Cyxtera Sterling DC3
|
|
11.41 miles
|
Amazon 22420 Kipper
|
|
11.45 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
11.45 miles
|
Amazon IAD-69
|
|
11.46 miles
|
XO (1220 L)
|
|
11.46 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
11.48 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
11.49 miles
|
Amazon 22370 Kipper
|
|
11.53 miles
|
Amazon IAD-58
|
|
11.54 miles
|
Cyxtera Sterling DC7
|
|
11.57 miles
|
COPT: 45761 Maries Rd
|
|
11.57 miles
|
Amazon IAD-57
|
|
11.61 miles
|
Amazon 45111 Loudoun Downs
|
|
11.65 miles
|
Amazon IAD-88
|
|
11.69 miles
|
COPT: 45751 Maries Rd
|
|
11.71 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
11.72 miles
|
Amazon IAD9
|
|
11.73 miles
|
Vantage VA11
|
|
11.77 miles
|
Amazon IAD1
|
|
11.78 miles
|
Sentinel Ashburn
|
|
11.79 miles
|
Vantage VA12
|
|
11.83 miles
|
Vantage VA13
|
|
11.84 miles
|
Amazon IAD22
|
|
11.88 miles
|
Amazon IAD12
|
|
11.96 miles
|
Skybox Northern Virginia
|
|
11.96 miles
|
Amazon IAD16
|
|
11.99 miles
|
Amazon IAD15
|
|
12.01 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
12.02 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
12.08 miles
|
Amazon 45305 Severn
|
|
12.13 miles
|
Amazon IAD76
|
|
12.14 miles
|
Amazon IAD10
|
|
12.16 miles
|
Amazon 45259 Severn
|
|
12.21 miles
|
Amazon IAD32
|
|
12.22 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
12.24 miles
|
EdgeCore Ashburn
|
|
12.25 miles
|
21710 Charles View
|
|
12.26 miles
|
PowerHouse Pacific
|
|
12.28 miles
|
CyrusOne Northern Virginia Sterling V
|
|
12.33 miles
|
21641 Charles View
|
|
12.42 miles
|
Digital Realty: Broderick Drive
|
|
12.45 miles
|
Digital Realty: IAD43
|
|
12.47 miles
|
QTS Ashburn Lockridge
|
|
12.57 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
12.60 miles
|
Lafayette Center Drive Campus - Digital Realty
|
|
12.61 miles
|
IBM Softlayer Chantilly WDC01
|
|
12.75 miles
|
H5 Ashburn
|
|
12.81 miles
|
Equinix DC21
|
|
12.88 miles
|
PowerHouse ABX1
|
|
12.88 miles
|
Amazon 25420 Sutton Bay
|
|
12.90 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
12.95 miles
|
44751 Round Table (Bldg P)
|
|
12.96 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
12.97 miles
|
Equinix DC15
|
|
12.97 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
12.99 miles
|
21780 Filigree: Digital Realty
|
|
13.00 miles
|
Amazon 25410 Sutton Bay
|
|
13.05 miles
|
Amazon 44854 Interconnection
|
|
13.08 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
13.08 miles
|
VPLS IAD
|
|
13.09 miles
|
Evoque Ashburn WDC1
|
|
13.11 miles
|
Amazon 44858 Interconnection Plaza
|
|
13.12 miles
|
Amazon Willard Road (Land)
|
|
13.12 miles
|
Amazon 25020 Willard Road
|
|
13.12 miles
|
Equinix Ashburn DC11
|
|
13.12 miles
|
Equinix Ashburn DC6
|
|
13.18 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
13.18 miles
|
Equinix Ashburn DC2
|
|
13.19 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
13.19 miles
|
ANEXIO VA1
|
|
13.20 miles
|
44351 Import Plz
|
|
13.21 miles
|
Equinix Ashburn DC1
|
|
13.21 miles
|
CloudHQ LC2
|
|
13.22 miles
|
CloudHQ Ashburn Campus
|
|
13.23 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
13.26 miles
|
Amazon 44862 Interconnection Plaza
|
|
13.28 miles
|
Equinix Ashburn DC5
|
|
13.30 miles
|
Level 3 Ashburn
|
|
13.30 miles
|
Equinix Ashburn DC4
|
|
13.34 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
13.35 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
13.36 miles
|
44274 Round Table (Bldg L)
|
|
13.36 miles
|
44490 Chilum Place: Digital Realty
|
|
13.39 miles
|
Import Plz, Ashburn
|
|
13.39 miles
|
NTT VA2
|
|
13.41 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
13.41 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
13.41 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
13.43 miles
|
QTS Ashburn-Shellhorn DC2
|
|
13.43 miles
|
44372 Round Table: Digital Realty
|
|
13.45 miles
|
Equinix Ashburn DC3
|
|
13.45 miles
|
ServerCentral Ashburn DC3
|
|
13.46 miles
|
44470 Chillum - Digital Realty
|
|
13.47 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
13.47 miles
|
ANEXIO Ashburn IAD4
|
|
13.47 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
13.47 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
13.50 miles
|
QTS Ashburn-Shellhorn
|
|
13.50 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
13.54 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
13.54 miles
|
Amazon IAD60
|
|
13.55 miles
|
Rackspace Ashburn IAD3
|
|
13.55 miles
|
44461 Chilum (ACC6) Digital Realty
|
|
13.59 miles
|
Amazon IAD71
|
|
13.63 miles
|
Amazon IAD50
|
|
13.63 miles
|
Equinix DC13
|
|
13.63 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
13.64 miles
|
Amazon IAD61
|
|
13.69 miles
|
Amazon IAD-63
|
|
13.74 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
13.74 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
13.74 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
13.75 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
13.75 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
13.75 miles
|
Amazon IAD-67
|
|
13.80 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
13.80 miles
|
Amazon Prediction Lane
|
|
13.80 miles
|
Aligned IAD02
|
|
13.82 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
13.84 miles
|
NTT Ashburn Campus
|
|
13.93 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
13.93 miles
|
NTT VA5
|
|
13.93 miles
|
43915 Devin Shafron (Bldg A)
|
|
13.96 miles
|
NTT VA4
|
|
13.99 miles
|
43881 Devin Shafron (Bldg B)
|
|
14.01 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
14.08 miles
|
43830 Devin Shafron (Bldg F)
|
|
14.11 miles
|
43831 Devin Shafron (Bldg C)
|
|
14.15 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
14.17 miles
|
43790 Devin Shafron (Bldg E)
|
|
14.22 miles
|
Amazon IAD-54
|
|
14.22 miles
|
43791 Devin Shafron (Bldg D)
|
|
14.27 miles
|
Databank Ashburn IAD1
|
|
14.27 miles
|
FastServ Ashburn
|
|
14.34 miles
|
DataBank Ashburn IAD3
|
|
14.41 miles
|
CyrusOne Sterling IX
|
|
15.14 miles
|
Amazon Fadeley I
|
|
15.16 miles
|
Amazon Fadeley II
|
|
15.27 miles
|
Amazon Fadeley III
|
|
15.55 miles
|
Google: Arcola 2
|
|
15.55 miles
|
Google Dulles Arcola Center
|
|
15.91 miles
|
Yondr Arcola, VA
|
|
15.97 miles
|
PowerHouse Arcola
|
|
16.68 miles
|
Amazon 41992 John Mosby Highway
|
|
17.09 miles
|
Equinix Manassas DC14
|
|
17.09 miles
|
AOL: 7777 Infantry Ridge
|
|
17.16 miles
|
12401 Prosperity Dr: Lincoln Rackhouse
|
12401 Prosperity Dr. is an enterprise grade, highly-secure data center located just 15 miles north of Washington D.C., in Silver Spring, MD.
|
17.18 miles
|
Agile Silver Spring MD
|
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
|
17.23 miles
|
Microsoft Aldie
|
|
17.64 miles
|
Vantage VA3 Campus
|
|
17.80 miles
|
Compass Loudoun County
|
|
18.25 miles
|
Google Leesburg Stonewall Park
|
|
18.64 miles
|
Amazon 7500 Bethlehem
|
|
18.78 miles
|
Amazon IAD7
|
|
18.81 miles
|
AiNET Beltsville WDC-1
|
|
18.85 miles
|
Amazon IAD24
|
|
18.92 miles
|
Amazon IAD11
|
|
19.06 miles
|
9020 Freedom Center
|
|
19.15 miles
|
QTS Manassas DC1
|
|
19.15 miles
|
9040 Freedom Center
|
|
19.24 miles
|
Amazon IAD-59
|
|
19.25 miles
|
Amazon IAD-52
|
|
19.27 miles
|
Amazon Bethlehem Technology Park DC18
|
|
19.28 miles
|
Amazon: 8190 Bethlehem
|
|
19.29 miles
|
Amazon IAD14
|
|
19.37 miles
|
Amazon Bethlehem Technology Park DC19
|
|
19.39 miles
|
QTS 10680 University Blvd
|
|
19.42 miles
|
Amazon Bethlehem Technology Park DC20
|
|
19.45 miles
|
QTS Manassas DC5
|
|
19.58 miles
|
AWS 10261 Tanner
|
|
19.67 miles
|
Iron Mountain VA-2
|
|
19.68 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
19.68 miles
|
AWS 10281 Tanner Way
|
|
19.73 miles
|
AWS IAD 101
|
|
19.74 miles
|
Opus Interactive Manassas
|
|
19.82 miles
|
AWS IAD 100
|
|