0.64 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
0.82 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
0.93 miles
|
ANEXIO Reston
|
|
0.93 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
1.12 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
1.12 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
1.52 miles
|
Level3 Reston 1
|
|
1.60 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
1.92 miles
|
Equinix DC97
|
|
2.06 miles
|
Lincoln Rackhouse 251 Exchange
|
|
2.09 miles
|
Cogent: 510 Huntmar
|
|
2.21 miles
|
Level3 Washington (Herndon 1)
|
|
2.89 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
4.31 miles
|
45900 Pathfinder Plz
|
|
4.35 miles
|
AWS: 45930 Pathfinder Plz
|
|
4.50 miles
|
AWS: 45950 Pathfinder Plz
|
|
4.56 miles
|
AWS: 22900 Platform Plz
|
|
4.71 miles
|
InfoRelay Herndon
|
|
4.82 miles
|
AWS: 22868 International Dr
|
|
4.83 miles
|
Cyxtera IAD2-A
|
|
4.87 miles
|
Cyxtera IAD2-B
|
|
4.92 miles
|
AWS: 22945 International Dr
|
|
4.94 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
4.94 miles
|
Amazon 13600 EDS Drive
|
|
5.61 miles
|
Vantage VA2 Campus
|
|
5.66 miles
|
Amazon IAD-51
|
|
5.69 miles
|
Amazon IAD-56
|
|
5.74 miles
|
Amazon 22420 Kipper
|
|
5.76 miles
|
Cyxtera Sterling DC7
|
|
5.77 miles
|
Amazon IAD-58
|
|
5.80 miles
|
Equinix Vienna DC8
|
|
5.82 miles
|
Amazon 22370 Kipper
|
|
5.82 miles
|
Amazon IAD-57
|
|
5.89 miles
|
Amazon 45111 Loudoun Downs
|
|
5.92 miles
|
Amazon IAD-88
|
|
5.93 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
6.05 miles
|
CyrusOne Sterling VIII
|
|
6.08 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
6.12 miles
|
Vantage VA11
|
|
6.13 miles
|
Amazon IAD12
|
|
6.14 miles
|
Sentinel Ashburn
|
|
6.15 miles
|
Vantage VA12
|
|
6.16 miles
|
Cyxtera Sterling DC2
|
|
6.19 miles
|
Cyxtera Sterling DC4
|
|
6.20 miles
|
Skybox Northern Virginia
|
|
6.21 miles
|
Vantage VA13
|
|
6.22 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
6.22 miles
|
Amazon IAD16
|
|
6.25 miles
|
Amazon IAD15
|
|
6.27 miles
|
Cyxtera Sterling DC3
|
|
6.30 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
6.36 miles
|
Amazon IAD-69
|
|
6.37 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
6.37 miles
|
COPT: 45761 Maries Rd
|
|
6.40 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
6.41 miles
|
Amazon IAD76
|
|
6.50 miles
|
COPT: 45751 Maries Rd
|
|
6.55 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
6.63 miles
|
PowerHouse Pacific
|
|
6.69 miles
|
Amazon 45305 Severn
|
|
6.74 miles
|
QTS Ashburn Lockridge
|
|
6.78 miles
|
Amazon 45259 Severn
|
|
6.78 miles
|
Digital Realty: Broderick Drive
|
|
6.78 miles
|
Digital Realty: IAD43
|
|
6.78 miles
|
21710 Charles View
|
|
6.80 miles
|
Amazon IAD10
|
|
6.82 miles
|
Cogent Vienna
|
|
6.83 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
6.85 miles
|
Amazon IAD32
|
|
6.87 miles
|
8100 Boone - Digital Realty
|
|
6.89 miles
|
21641 Charles View
|
|
6.91 miles
|
Amazon IAD9
|
|
6.96 miles
|
CyrusOne Northern Virginia Sterling V
|
|
7.01 miles
|
Amazon IAD1
|
|
7.05 miles
|
EdgeCore Ashburn
|
|
7.06 miles
|
Amazon IAD22
|
|
7.19 miles
|
H5 Ashburn
|
|
7.22 miles
|
Equinix DC21
|
|
7.28 miles
|
Equinix Vienna DC7
|
|
7.31 miles
|
44751 Round Table (Bldg P)
|
|
7.33 miles
|
Element Critical VA1
|
|
7.37 miles
|
PowerHouse ABX1
|
|
7.41 miles
|
21780 Filigree: Digital Realty
|
|
7.41 miles
|
DataBank McLean IAD2
|
|
7.42 miles
|
Level3 McLean 1
|
|
7.44 miles
|
44351 Import Plz
|
|
7.47 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
7.47 miles
|
IBM Softlayer Chantilly WDC01
|
|
7.48 miles
|
Lafayette Center Drive Campus - Digital Realty
|
|
7.50 miles
|
Equinix DC15
|
|
7.51 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
7.51 miles
|
VPLS IAD
|
|
7.52 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
7.54 miles
|
Equinix Ashburn DC11
|
|
7.54 miles
|
Equinix Ashburn DC6
|
|
7.58 miles
|
CloudHQ Ashburn Campus
|
|
7.59 miles
|
CloudHQ LC2
|
|
7.60 miles
|
Evoque Ashburn WDC1
|
|
7.61 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
7.61 miles
|
Equinix Ashburn DC2
|
|
7.62 miles
|
Amazon 25420 Sutton Bay
|
|
7.63 miles
|
Equinix Ashburn DC1
|
|
7.63 miles
|
Import Plz, Ashburn
|
|
7.64 miles
|
Amazon 44854 Interconnection
|
|
7.68 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
7.69 miles
|
QTS Ashburn-Shellhorn DC2
|
|
7.69 miles
|
44274 Round Table (Bldg L)
|
|
7.69 miles
|
Amazon 44858 Interconnection Plaza
|
|
7.69 miles
|
Equinix Ashburn DC5
|
|
7.70 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
7.70 miles
|
ANEXIO VA1
|
|
7.70 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
7.73 miles
|
Equinix Ashburn DC4
|
|
7.73 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
7.75 miles
|
QTS Ashburn-Shellhorn
|
|
7.75 miles
|
Amazon 25410 Sutton Bay
|
|
7.75 miles
|
44372 Round Table: Digital Realty
|
|
7.76 miles
|
Amazon 25020 Willard Road
|
|
7.76 miles
|
Amazon Willard Road (Land)
|
|
7.77 miles
|
XO Fairfax
|
|
7.79 miles
|
Level 3 Ashburn
|
|
7.79 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
7.82 miles
|
Amazon 44862 Interconnection Plaza
|
|
7.83 miles
|
44490 Chilum Place: Digital Realty
|
|
7.83 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
7.83 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
7.85 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
7.91 miles
|
NTT VA2
|
|
7.91 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
7.91 miles
|
ANEXIO Ashburn IAD4
|
|
7.92 miles
|
Equinix Ashburn DC3
|
|
7.92 miles
|
ServerCentral Ashburn DC3
|
|
7.93 miles
|
44470 Chillum - Digital Realty
|
|
7.95 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
7.95 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
7.97 miles
|
Equinix DC13
|
|
8.00 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
8.00 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
8.00 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
8.00 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
8.00 miles
|
Rackspace Ashburn IAD3
|
|
8.00 miles
|
44461 Chilum (ACC6) Digital Realty
|
|
8.01 miles
|
Amazon IAD-67
|
|
8.01 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
8.06 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
8.10 miles
|
Amazon IAD60
|
|
8.12 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
8.13 miles
|
Aligned IAD02
|
|
8.14 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
8.15 miles
|
Amazon IAD71
|
|
8.16 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
8.18 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
8.19 miles
|
Amazon IAD50
|
|
8.20 miles
|
43915 Devin Shafron (Bldg A)
|
|
8.25 miles
|
43881 Devin Shafron (Bldg B)
|
|
8.25 miles
|
NTT Ashburn Campus
|
|
8.32 miles
|
NTT VA5
|
|
8.35 miles
|
43830 Devin Shafron (Bldg F)
|
|
8.37 miles
|
NTT VA4
|
|
8.37 miles
|
43831 Devin Shafron (Bldg C)
|
|
8.37 miles
|
Amazon IAD61
|
|
8.37 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
8.39 miles
|
Amazon IAD-63
|
|
8.44 miles
|
43790 Devin Shafron (Bldg E)
|
|
8.47 miles
|
Amazon IAD-54
|
|
8.47 miles
|
43791 Devin Shafron (Bldg D)
|
|
8.47 miles
|
Amazon Prediction Lane
|
|
8.49 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
8.61 miles
|
Databank Ashburn IAD1
|
|
8.61 miles
|
FastServ Ashburn
|
|
8.68 miles
|
CyrusOne Sterling IX
|
|
8.69 miles
|
DataBank Ashburn IAD3
|
|
8.71 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
9.46 miles
|
Amazon Fadeley I
|
|
9.50 miles
|
Amazon Fadeley II
|
|
9.60 miles
|
Amazon Fadeley III
|
|
9.91 miles
|
Google Dulles Arcola Center
|
|
9.93 miles
|
Google: Arcola 2
|
|
10.22 miles
|
Yondr Arcola, VA
|
|
10.34 miles
|
PowerHouse Arcola
|
|
11.04 miles
|
Amazon 41992 John Mosby Highway
|
|
11.55 miles
|
Microsoft Aldie
|
|
12.17 miles
|
Compass Loudoun County
|
|
12.41 miles
|
Vantage VA3 Campus
|
|
12.67 miles
|
Google Leesburg Stonewall Park
|
|
13.62 miles
|
AOL: 7777 Infantry Ridge
|
|
13.66 miles
|
Equinix Manassas DC14
|
|
14.87 miles
|
Microsoft Leesburg 1A
|
|
15.08 miles
|
XO (4301 Connecticut)
|
|
15.14 miles
|
Amazon 7500 Bethlehem
|
|
15.26 miles
|
Amazon IAD7
|
|
15.32 miles
|
Amazon IAD24
|
|
15.39 miles
|
Amazon IAD11
|
|
15.61 miles
|
Amazon IAD-59
|
|
15.65 miles
|
Amazon IAD-52
|
|
15.71 miles
|
Amazon IAD14
|
|
15.90 miles
|
Amazon: 8190 Bethlehem
|
|
15.93 miles
|
Amazon Bethlehem Technology Park DC18
|
|
16.00 miles
|
Amazon Bethlehem Technology Park DC19
|
|
16.03 miles
|
Amazon Bethlehem Technology Park DC20
|
|
16.18 miles
|
9020 Freedom Center
|
|
16.27 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
16.27 miles
|
9040 Freedom Center
|
|
16.28 miles
|
Iron Mountain VA-2
|
|
16.40 miles
|
Opus Interactive Manassas
|
|
16.41 miles
|
QTS Manassas DC1
|
|
16.57 miles
|
Corscale: Gainesville Crossing
|
|
16.64 miles
|
QTS Manassas DC5
|
|
16.68 miles
|
QTS 10680 University Blvd
|
|
16.68 miles
|
Amazon IAD-74
|
|
16.70 miles
|
Amazon IAD-73
|
|
17.02 miles
|
XO: 1120 Vermont
|
|
17.03 miles
|
Cogent: 1120 Vermont
|
|
17.03 miles
|
Level3 Washington
|
|
17.10 miles
|
CoreSite DC2
|
|
17.17 miles
|
AWS 10261 Tanner
|
|
17.25 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
17.25 miles
|
XO (1220 L)
|
|
17.25 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
17.30 miles
|
AWS 10281 Tanner Way
|
|
17.32 miles
|
AWS IAD 101
|
|
17.38 miles
|
Amazon IAD-77
|
|
17.38 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
17.38 miles
|
Evoswitch USA WDC 1
|
|
17.38 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
17.42 miles
|
AWS IAD 100
|
|
17.50 miles
|
Amazon: 11150 Thomasson Barn
|
|
17.55 miles
|
Amazon: 11200 Thomasson Barn
|
|
17.59 miles
|
Yondr Bristow Campus
|
|
17.81 miles
|
NTT Gainesville VA Campus
|
|
17.91 miles
|
CloudHQ MCC2
|
|
18.11 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
18.23 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
18.26 miles
|
CloudHQ MCC3
|
|
18.91 miles
|
Amazon IAD-55
|
|
19.08 miles
|
Amazon: 15455 John Marshall
|
|
19.14 miles
|
Amazon 15465 John Marshall
|
|