AOL: 7777 Infantry Ridge

Street Address
Interested in this information? Contact us

░░░░░░░ Login to view SqFt Total Building Size

Show SqM

Operated by:

Map and Nearby Locations:

This Facility
Click Map to begin Search

Sites within 15 miles of AOL: 7777 Infantry Ridge

Show SqM
Distance Site About
0.14 miles Equinix Manassas DC14
1.55 miles Amazon 7500 Bethlehem
1.69 miles Amazon IAD7
1.76 miles Amazon IAD24
1.83 miles Amazon IAD11
2.16 miles Amazon IAD-59
2.16 miles Amazon IAD-52
2.20 miles Amazon IAD14
2.28 miles Amazon: 8190 Bethlehem
2.31 miles Amazon Bethlehem Technology Park DC18
2.37 miles Amazon Bethlehem Technology Park DC19
2.40 miles Amazon Bethlehem Technology Park DC20
2.65 miles Iron Mountain Northern Virginia (Manassas)
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
2.66 miles Iron Mountain VA-2
2.78 miles Opus Interactive Manassas
3.03 miles 9020 Freedom Center
3.10 miles Amazon IAD-74
3.10 miles 9040 Freedom Center
3.13 miles Amazon IAD-73
3.48 miles QTS Manassas DC1
3.51 miles QTS Manassas DC5
3.72 miles QTS 10680 University Blvd
3.78 miles Corscale: Gainesville Crossing
4.10 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
4.10 miles VAZATA Northern Virginia (NoVa One)
4.10 miles Amazon IAD-77
4.10 miles Evoswitch USA WDC 1
4.12 miles Amazon: 5945 Wellington
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
4.22 miles Yondr Bristow Campus
4.30 miles Amazon: 11150 Thomasson Barn
4.33 miles Amazon: 11200 Thomasson Barn
4.70 miles AWS 10261 Tanner
4.79 miles AWS IAD 101
4.83 miles AWS 10281 Tanner Way
4.90 miles AWS IAD 100
4.94 miles 8217 Linton Hall (VA4) Digital Realty
5.38 miles NTT Gainesville VA Campus
5.70 miles CloudHQ MCC2
5.99 miles CloudHQ Manassas MCC1
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
6.17 miles CloudHQ MCC3
7.13 miles Amazon IAD22
7.15 miles Amazon IAD1
7.28 miles Amazon IAD9
7.36 miles Amazon IAD-55
7.57 miles Lafayette Center Drive Campus - Digital Realty
7.58 miles Amazon: 15455 John Marshall
7.62 miles IBM Softlayer Chantilly WDC01
7.62 miles Amazon 15465 John Marshall
7.71 miles Amazon IAD61
7.80 miles Amazon 25430 Sutton Bay IAD150
7.84 miles Amazon IAD-63
7.86 miles Amazon 25410 Sutton Bay
7.89 miles Amazon Prediction Lane
7.96 miles Amazon 25420 Sutton Bay
8.24 miles Amazon Willard Road (Land)
8.24 miles Amazon 25020 Willard Road
9.32 miles Amazon 13600 EDS Drive
9.51 miles Google: Arcola 2
9.60 miles OVH US East Vint Hill
9.65 miles PowerHouse Arcola
9.78 miles Google Dulles Arcola Center
9.89 miles Amazon 41992 John Mosby Highway
9.92 miles Amazon Fadeley II
10.00 miles Amazon Fadeley III
10.02 miles InfoRelay Herndon
10.03 miles Amazon Fadeley I
10.23 miles Yondr Arcola, VA
10.46 miles Microsoft Aldie
10.57 miles CyrusOne Sterling IX
10.88 miles Digital Realty Dulles
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
11.81 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
12.42 miles CoreSite Reston VA3
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
12.46 miles Level3 Reston 1
12.62 miles Lincoln Rackhouse 251 Exchange
12.71 miles Cyxtera Sterling DC7
12.82 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
12.82 miles CoreSite Reston Campus VA1 VA2
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
13.01 miles Cogent: 510 Huntmar
13.04 miles Equinix DC97
13.05 miles AWS: 22945 International Dr
13.09 miles Amazon IAD-58
13.14 miles AWS: 22868 International Dr
13.17 miles Amazon IAD-57
13.17 miles Amazon IAD12
13.18 miles Level3 Washington (Herndon 1)
13.19 miles Skybox Northern Virginia
13.23 miles Cyxtera IAD2-B
13.26 miles Cyxtera IAD2-A
13.26 miles CyrusOne Northern Virginia Sterling IV
13.28 miles Amazon IAD16
13.28 miles AWS: 22900 Platform Plz
13.33 miles 44351 Import Plz
13.35 miles Amazon IAD15
13.37 miles Import Plz, Ashburn
13.40 miles Amazon IAD-88
13.43 miles Amazon 45111 Loudoun Downs
13.45 miles Amazon IAD-56
13.48 miles QTS Ashburn-Shellhorn
13.49 miles Amazon IAD76
13.52 miles Amazon IAD-51
13.53 miles Sentinel Washington Dulles Gateway
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
13.53 miles QTS Ashburn Lockridge
13.54 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
13.55 miles QTS Ashburn-Shellhorn DC2
13.62 miles InfoRelay Reston
13.65 miles Amazon IAD-67
13.65 miles 43940 Digital Loudoun Plaza (Bldg G)
13.71 miles Digital Realty Loudoun Ashburn Campus
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
13.71 miles 45900 Pathfinder Plz
13.71 miles 43881 Devin Shafron (Bldg B)
13.73 miles 43780 Digital Loudoun Plaza (Bldg H)
13.73 miles 44060 Digital Loudoun Plaza (Bldg K)
13.73 miles 44100 Digital Loudoun Plaza (Bldg J)
13.74 miles 43831 Devin Shafron (Bldg C)
13.75 miles AWS: 45950 Pathfinder Plz
13.77 miles Amazon 22420 Kipper
13.77 miles 43915 Devin Shafron (Bldg A)
13.77 miles 43791 Devin Shafron (Bldg D)
13.77 miles Amazon IAD-54
13.81 miles AWS: 45930 Pathfinder Plz
13.81 miles Amazon 22370 Kipper
13.85 miles 43830 Devin Shafron (Bldg F)
13.90 miles 43790 Devin Shafron (Bldg E)
13.91 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
13.93 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
13.97 miles Digital Realty: IAD43
13.99 miles VPLS DC1
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
14.02 miles Vantage VA2 Campus
14.05 miles ANEXIO Reston
14.05 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
14.06 miles Vantage VA12
14.07 miles Sentinel Ashburn
14.14 miles Vantage Ashburn Campus
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
14.21 miles 44372 Round Table: Digital Realty
14.22 miles Digital Realty: Broderick Drive
14.23 miles Vantage VA13
14.24 miles PowerHouse Pacific
14.24 miles Vantage VA11
14.25 miles 44274 Round Table (Bldg L)
14.33 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
14.35 miles Aligned IAD02
14.37 miles 44751 Round Table (Bldg P)
14.42 miles Equinix DC13
14.44 miles CloudHQ Ashburn Campus
14.58 miles CloudHQ LC2
14.58 miles Sabey Intergate.Ashburn (Building A)
14.60 miles 21744 Sir Timothy Drive (ACC10)
14.63 miles Aligned Ashburn
The first building on the Aligned 26-acre campus was launched in September 2019.
14.64 miles Aligned IAD03
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
14.64 miles Equinix DC21
14.66 miles Databank Ashburn IAD1
14.68 miles Sabey Intergate.Ashburn
Intergate.Ashburn is a purpose-built data center campus on 38 acres
14.68 miles FastServ Ashburn
14.68 miles 21745 Sir Timothy (ACC9) Digital Realty
14.76 miles 21780 Filigree: Digital Realty
14.79 miles H5 Ashburn
14.80 miles Equinix Ashburn DC6
14.80 miles Equinix Ashburn DC11
14.82 miles DataBank Ashburn IAD3
14.82 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
14.82 miles VPLS IAD
14.84 miles Equinix Ashburn DC5
14.84 miles Equinix Ashburn DC1
14.87 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
14.89 miles Equinix Ashburn DC2
14.89 miles Equinix Ashburn Campus
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
14.89 miles Equinix Ashburn DC4
14.90 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
14.91 miles NTT VA5
14.96 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
14.96 miles ANEXIO ACC5
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
14.98 miles NTT Ashburn Campus
15.04 miles NTT VA4
15.07 miles 44521 Hastings (ACC2) Digital Realty
15.07 miles ANEXIO Ashburn IAD4
15.10 miles 21710 Charles View
15.10 miles 44521 Hastings (ACC4) Digital Realty
15.11 miles 44520 Hastings (ACC3) Digital Realty
15.17 miles PowerHouse ABX1
15.17 miles Rackspace Ashburn IAD3
15.17 miles 44461 Chilum (ACC6) Digital Realty
15.18 miles Cologix Ashburn ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
15.19 miles 44490 Chilum Place: Digital Realty
15.24 miles 44470 Chillum - Digital Realty
15.25 miles Equinix Ashburn DC3
15.25 miles ServerCentral Ashburn DC3
15.26 miles XO Fairfax
15.28 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
15.28 miles 21641 Charles View
15.30 miles Level 3 Ashburn
15.33 miles Evoque Ashburn WDC1
15.35 miles ANEXIO VA1
15.35 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
15.38 miles Equinix DC15
15.39 miles Amazon 45305 Severn
15.45 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
15.45 miles Amazon 45259 Severn
15.48 miles NTT VA2
15.54 miles Amazon IAD32
15.60 miles Amazon IAD10
15.65 miles Amazon 44858 Interconnection Plaza
15.65 miles Amazon 44862 Interconnection Plaza
15.68 miles Amazon 44854 Interconnection
15.74 miles CyrusOne Northern Virginia Sterling V
15.75 miles Amazon IAD60
15.75 miles Amazon IAD71
15.79 miles Amazon IAD50
15.86 miles CyrusOne Sterling VIII
15.91 miles COPT: 45761 Maries Rd
15.98 miles COPT: 45751 Maries Rd
16.00 miles Cyxtera Sterling DC2
16.00 miles Cyxtera Sterling DC3
16.10 miles Cyxtera Sterling DC4
16.12 miles 21110 Ridgetop - Digital Realty
The site is fully leased to triple net tenants.
16.14 miles CyrusOne Northern Virginia Sterling I, II, III
16.17 miles Amazon IAD-69
16.20 miles EdgeCore Ashburn
16.33 miles AWS: 20945 Loudoun County Pkwy
16.36 miles AWS: 20935 Loudoun County Pkwy
16.55 miles Compass Loudoun County
17.05 miles Cogent Vienna
17.09 miles Equinix Vienna DC8
17.15 miles 8100 Boone - Digital Realty
17.16 miles Google Leesburg Stonewall Park
17.26 miles Equinix Vienna DC7
17.29 miles Element Critical VA1
17.33 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
17.96 miles DataBank McLean IAD2
18.00 miles Level3 McLean 1
18.99 miles Vantage VA3 Campus
19.42 miles Microsoft Leesburg 1A

AOL: 7777 Infantry Ridge Data Center Photos

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Ashburn Data Center Cluster Map
Posted in Northern Virginia

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

The Yahoo, AOL, HuffPo mashup known as Oath has been retired. The subsidiary is now known as Verizon Media Group.

Verizon Retired the Oath Brand in 2019
Posted in Yahoo

The Yahoo, AOL, HuffPo mashup known as Oath has been retired. The subsidiary is now known as Verizon Media Group.

Source: Techcrunch

Operating Company

In 2021, Verizon sold Verizon Media to the Apollo Group. The new entity will be known as Yahoo.

Verizon acquired Yahoo in June 2017 and rolled the company into a newly rebranded subsidiary called Oath which included other media brands, AOL, HuffPost, and Techcrunch.

In January 2019, Verizon announced it would retire the Oath brand and rename the subsidiary to Verizon Media.

4 Facilities Owned
4 Markets Served
122.0 Megawatts
View Company

News

Read More News