QTS acquired this site via the Carpathia acquisition in 2015.

Power:


  • 2N on MGE UPS Power
  • 4kW Cabinets and 6kW cabinets available
  • UPS supportable loads (N+1); block redundant system with (5+1) electrical bus
  • 6 power transformers Utility voltage = 34.5 kV
  • Standby power configuration: N+1 block redundant
  • N+1 on Cummins generators and Trane Chiller System
  • Three generators. One primary generator and one primary utility per 1125 kW

Cooling:


  • Cooling plant – split system, direct expansion, air cooled
  • Hydronic chilled water closed look system feeding multiple central air handling units
  • Five 650 ton water-cooled Carrier chilled water units
  • Five primary chilled water pumps and three secondary chilled water pumps, both having one redundant pump
  • 21 Rascan air handling units supply conditioned air

Building:


4,040 SqFt of Office space

Map and Nearby Locations:

21701 Filigree Ct
Click Map to begin Search

Sites within 15 miles of QTS Ashburn (Carpathia)

Show SqM
Distance Site About
0.00 miles VPLS IAD
0.05 miles Equinix Ashburn DC6
0.05 miles Equinix Ashburn DC11
0.10 miles 21780 Filigree: Digital Realty
0.11 miles Equinix Ashburn DC2
0.11 miles Equinix Ashburn Campus
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
0.13 miles Equinix Ashburn DC1
0.20 miles Equinix Ashburn DC5
0.22 miles Equinix Ashburn DC4
0.29 miles Equinix DC21
0.32 miles CloudHQ LC2
0.33 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
0.33 miles ANEXIO ACC5
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
0.34 miles H5 Ashburn
0.34 miles 44520 Hastings (ACC3) Digital Realty
0.36 miles Cologix Ashburn ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
0.41 miles 21744 Sir Timothy Drive (ACC10)
0.41 miles 44490 Chilum Place: Digital Realty
0.41 miles 44521 Hastings (ACC2) Digital Realty
0.41 miles ANEXIO Ashburn IAD4
0.45 miles 44521 Hastings (ACC4) Digital Realty
0.45 miles CloudHQ Ashburn Campus
0.46 miles 44751 Round Table (Bldg P)
0.46 miles PowerHouse ABX1
0.46 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
0.47 miles 21745 Sir Timothy (ACC9) Digital Realty
0.48 miles Level 3 Ashburn
0.50 miles 44470 Chillum - Digital Realty
0.50 miles Equinix Ashburn DC3
0.50 miles ServerCentral Ashburn DC3
0.52 miles Rackspace Ashburn IAD3
0.52 miles 44461 Chilum (ACC6) Digital Realty
0.52 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
0.52 miles Evoque Ashburn WDC1
0.53 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
0.53 miles ANEXIO VA1
0.62 miles Equinix DC15
0.65 miles Aligned Ashburn
The first building on the Aligned 26-acre campus was launched in September 2019.
0.67 miles NTT VA2
0.68 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
0.69 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
0.72 miles 44274 Round Table (Bldg L)
0.76 miles NTT Ashburn Campus
0.79 miles Equinix DC13
0.81 miles 44372 Round Table: Digital Realty
0.81 miles Digital Realty: Broderick Drive
0.83 miles Amazon 44862 Interconnection Plaza
0.85 miles Amazon 44858 Interconnection Plaza
0.86 miles NTT VA5
0.87 miles NTT VA4
0.90 miles Amazon 44854 Interconnection
0.92 miles PowerHouse Pacific
0.94 miles Amazon IAD60
0.96 miles Amazon IAD71
0.96 miles 21710 Charles View
0.97 miles Digital Realty: IAD43
0.99 miles Aligned IAD02
1.00 miles Amazon IAD50
1.01 miles 21641 Charles View
1.02 miles Sabey Intergate.Ashburn
Intergate.Ashburn is a purpose-built data center campus on 38 acres
1.11 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
1.13 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
1.21 miles Sabey Intergate.Ashburn (Building A)
1.28 miles Amazon 45259 Severn
1.29 miles FastServ Ashburn
1.29 miles Databank Ashburn IAD1
1.30 miles Vantage VA13
1.30 miles Amazon IAD32
1.31 miles Amazon 45305 Severn
1.31 miles DataBank Ashburn IAD3
1.32 miles Sentinel Washington Dulles Gateway
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
1.34 miles QTS Ashburn Lockridge
1.39 miles Vantage VA11
1.39 miles Vantage VA12
1.40 miles Sentinel Ashburn
1.41 miles Amazon IAD10
1.42 miles CyrusOne Northern Virginia Sterling V
1.43 miles Vantage Ashburn Campus
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
1.44 miles QTS Ashburn-Shellhorn DC2
1.45 miles 44100 Digital Loudoun Plaza (Bldg J)
1.45 miles 44060 Digital Loudoun Plaza (Bldg K)
1.45 miles 43780 Digital Loudoun Plaza (Bldg H)
1.51 miles AWS: 20945 Loudoun County Pkwy
1.52 miles Amazon IAD76
1.53 miles 43940 Digital Loudoun Plaza (Bldg G)
1.53 miles Amazon IAD-67
1.54 miles QTS Ashburn-Shellhorn
1.54 miles AWS: 20935 Loudoun County Pkwy
1.54 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
1.56 miles 43915 Devin Shafron (Bldg A)
1.56 miles 44351 Import Plz
1.58 miles Import Plz, Ashburn
1.61 miles Digital Realty Loudoun Ashburn Campus
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
1.61 miles 43830 Devin Shafron (Bldg F)
1.64 miles Aligned IAD03
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
1.65 miles 43881 Devin Shafron (Bldg B)
1.66 miles 43790 Devin Shafron (Bldg E)
1.70 miles Amazon IAD15
1.73 miles 43831 Devin Shafron (Bldg C)
1.76 miles Amazon 22370 Kipper
1.77 miles Amazon IAD16
1.79 miles Amazon IAD-54
1.79 miles 43791 Devin Shafron (Bldg D)
1.84 miles Amazon 22420 Kipper
1.85 miles Skybox Northern Virginia
1.87 miles Amazon IAD-88
1.87 miles Amazon 45111 Loudoun Downs
1.88 miles EdgeCore Ashburn
1.90 miles Amazon IAD12
1.91 miles Vantage VA2 Campus
2.00 miles Amazon IAD-51
2.01 miles Amazon IAD-56
2.09 miles Amazon IAD-57
2.09 miles COPT: 45751 Maries Rd
2.14 miles COPT: 45761 Maries Rd
2.17 miles Amazon IAD-58
2.35 miles Cyxtera Sterling DC3
2.41 miles CyrusOne Northern Virginia Sterling I, II, III
2.41 miles CyrusOne Sterling VIII
2.45 miles Amazon IAD-69
2.45 miles Cyxtera Sterling DC2
2.47 miles Cyxtera Sterling DC7
2.51 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
2.53 miles 21110 Ridgetop - Digital Realty
The site is fully leased to triple net tenants.
2.54 miles Cyxtera Sterling DC4
2.72 miles CyrusOne Northern Virginia Sterling IV
2.80 miles Cyxtera IAD2-B
2.81 miles Cyxtera IAD2-A
2.84 miles AWS: 22945 International Dr
2.87 miles AWS: 22868 International Dr
3.01 miles AWS: 45950 Pathfinder Plz
3.05 miles AWS: 22900 Platform Plz
3.16 miles AWS: 45930 Pathfinder Plz
3.20 miles 45900 Pathfinder Plz
4.17 miles Digital Realty Dulles
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
4.71 miles Compass Loudoun County
4.72 miles CyrusOne Sterling IX
5.17 miles Vantage VA3 Campus
5.18 miles Google Leesburg Stonewall Park
5.34 miles Level3 Washington (Herndon 1)
5.50 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
5.52 miles Cogent: 510 Huntmar
5.61 miles Amazon Fadeley I
5.68 miles Equinix DC97
5.72 miles Amazon Fadeley II
5.73 miles Amazon Fadeley III
5.74 miles Lincoln Rackhouse 251 Exchange
5.80 miles InfoRelay Herndon
6.00 miles Yondr Arcola, VA
6.10 miles Google Dulles Arcola Center
6.32 miles Google: Arcola 2
6.46 miles CoreSite Reston VA3
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
6.51 miles PowerHouse Arcola
6.54 miles Level3 Reston 1
6.59 miles Amazon Willard Road (Land)
6.59 miles Amazon 25020 Willard Road
6.61 miles Amazon 13600 EDS Drive
6.70 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
6.70 miles CoreSite Reston Campus VA1 VA2
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
6.88 miles Amazon 25420 Sutton Bay
6.89 miles Amazon 41992 John Mosby Highway
6.97 miles Amazon 25410 Sutton Bay
6.97 miles Microsoft Aldie
6.99 miles Amazon Prediction Lane
7.03 miles Amazon IAD-63
7.04 miles Amazon 25430 Sutton Bay IAD150
7.14 miles Amazon IAD61
7.27 miles IBM Softlayer Chantilly WDC01
7.31 miles Lafayette Center Drive Campus - Digital Realty
7.37 miles Microsoft Leesburg 1A
7.51 miles InfoRelay Reston
7.99 miles Amazon IAD9
8.10 miles Amazon IAD22
8.11 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
8.11 miles Amazon IAD1
8.28 miles VPLS DC1
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
8.39 miles ANEXIO Reston
8.39 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
13.08 miles Equinix Vienna DC8
14.25 miles Cogent Vienna
14.29 miles 8100 Boone - Digital Realty
14.72 miles Equinix Vienna DC7
14.74 miles Level3 McLean 1
14.74 miles DataBank McLean IAD2
14.76 miles Element Critical VA1
14.82 miles AOL: 7777 Infantry Ridge
14.92 miles Equinix Manassas DC14
15.22 miles XO Fairfax
15.99 miles Amazon 7500 Bethlehem
16.07 miles Amazon IAD7
16.10 miles Amazon IAD24
16.16 miles Amazon IAD11
16.17 miles Amazon IAD-59
16.23 miles Amazon IAD-52
16.30 miles Corscale: Gainesville Crossing
16.31 miles Amazon IAD14
16.83 miles Amazon: 8190 Bethlehem
16.91 miles Amazon Bethlehem Technology Park DC20
16.91 miles Amazon Bethlehem Technology Park DC19
16.92 miles Amazon Bethlehem Technology Park DC18
16.97 miles NTT Gainesville VA Campus
17.09 miles Iron Mountain Northern Virginia (Manassas)
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
17.12 miles Amazon: 5945 Wellington
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
17.14 miles Iron Mountain VA-2
17.21 miles Amazon IAD-55
17.27 miles Amazon IAD-73
17.29 miles Amazon IAD-74
17.30 miles Amazon: 15455 John Marshall
17.32 miles Opus Interactive Manassas
17.36 miles Amazon 15465 John Marshall
17.70 miles Yondr Bristow Campus
17.84 miles 9020 Freedom Center
17.92 miles 9040 Freedom Center
18.13 miles 8217 Linton Hall (VA4) Digital Realty
18.25 miles QTS Manassas DC1
18.33 miles QTS Manassas DC5
18.51 miles QTS 10680 University Blvd
18.92 miles Evoswitch USA WDC 1
18.92 miles Amazon IAD-77
18.92 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
18.92 miles VAZATA Northern Virginia (NoVa One)
19.13 miles Amazon: 11150 Thomasson Barn
19.15 miles Amazon: 11200 Thomasson Barn
19.37 miles AWS 10261 Tanner
19.48 miles AWS IAD 101
19.50 miles AWS 10281 Tanner Way
19.60 miles AWS IAD 100

QTS Ashburn (Carpathia) Data Center Photos

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Ashburn Data Center Cluster Map
Posted in Northern Virginia

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.


QTS Primary Photo
Posted in QTS Data Centers

Operating Company

Company History:


  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
  • 2003: Company acquired first data center in Overland Park, KS
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2010 Acquired their Richmond facility
  • 2013: When public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2014 Expanded with Chicago and Princeton data centers
  • May 2015: QTS acquires Carpathis Hosting for $326 million. [1] The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities. [2] [3]

Headquarters:


QTS maintains three different operational headquarters. The corporate headquarters are in Overland Park, KS. The operational headquarters are in Suwanee, GA. Carpathia headquarters have remained in Dulles, VA to better serve government clients.

References:


1. PR Newswire May 6, 2015
2. The Whir article July 5, 2012
3. The Whir article Feb 28, 2011

39 Facilities Owned
21 Markets Served
585.0 Megawatts
View Company

News

Read More News