0.69 miles
|
CyrusOne Sterling IX
|
|
1.64 miles
|
Amazon Fadeley I
|
|
1.72 miles
|
Amazon Fadeley II
|
|
1.78 miles
|
Amazon Fadeley III
|
|
2.16 miles
|
Google Dulles Arcola Center
|
|
2.29 miles
|
Yondr Arcola, VA
|
|
2.31 miles
|
Google: Arcola 2
|
|
2.60 miles
|
Import Plz, Ashburn
|
|
2.61 miles
|
44351 Import Plz
|
|
2.61 miles
|
PowerHouse Arcola
|
|
2.68 miles
|
QTS Ashburn-Shellhorn
|
|
2.76 miles
|
QTS Ashburn-Shellhorn DC2
|
|
2.80 miles
|
Amazon Willard Road (Land)
|
|
2.80 miles
|
Amazon 25020 Willard Road
|
|
2.81 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
2.81 miles
|
Amazon IAD-67
|
|
2.84 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
2.85 miles
|
43881 Devin Shafron (Bldg B)
|
|
2.86 miles
|
43831 Devin Shafron (Bldg C)
|
|
2.89 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
2.89 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
2.89 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
2.89 miles
|
43791 Devin Shafron (Bldg D)
|
|
2.89 miles
|
Amazon IAD-54
|
|
2.91 miles
|
43915 Devin Shafron (Bldg A)
|
|
2.96 miles
|
Cyxtera Sterling DC7
|
|
2.98 miles
|
43830 Devin Shafron (Bldg F)
|
|
2.99 miles
|
Amazon Prediction Lane
|
|
3.02 miles
|
43790 Devin Shafron (Bldg E)
|
|
3.05 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
3.06 miles
|
Skybox Northern Virginia
|
|
3.06 miles
|
Amazon IAD-63
|
|
3.09 miles
|
Amazon IAD12
|
|
3.09 miles
|
QTS Ashburn Lockridge
|
|
3.13 miles
|
Amazon IAD16
|
|
3.18 miles
|
Amazon IAD15
|
|
3.19 miles
|
Amazon IAD61
|
|
3.20 miles
|
Amazon 25420 Sutton Bay
|
|
3.20 miles
|
Amazon 41992 John Mosby Highway
|
|
3.22 miles
|
Amazon IAD76
|
|
3.24 miles
|
Amazon 25410 Sutton Bay
|
|
3.25 miles
|
Amazon IAD-58
|
|
3.28 miles
|
Amazon IAD-57
|
|
3.33 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
3.35 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
3.43 miles
|
Amazon IAD-88
|
|
3.44 miles
|
44372 Round Table: Digital Realty
|
|
3.47 miles
|
Amazon 45111 Loudoun Downs
|
|
3.50 miles
|
44274 Round Table (Bldg L)
|
|
3.52 miles
|
Aligned IAD02
|
|
3.53 miles
|
Digital Realty: IAD43
|
|
3.58 miles
|
Microsoft Aldie
|
|
3.59 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
3.62 miles
|
Equinix DC13
|
|
3.62 miles
|
Amazon IAD-56
|
|
3.69 miles
|
Amazon IAD-51
|
|
3.71 miles
|
IBM Softlayer Chantilly WDC01
|
|
3.72 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
3.73 miles
|
CloudHQ Ashburn Campus
|
|
3.74 miles
|
44751 Round Table (Bldg P)
|
|
3.75 miles
|
Lafayette Center Drive Campus - Digital Realty
|
|
3.79 miles
|
Databank Ashburn IAD1
|
|
3.79 miles
|
Digital Realty: Broderick Drive
|
|
3.80 miles
|
FastServ Ashburn
|
|
3.82 miles
|
AWS: 22945 International Dr
|
|
3.82 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
3.83 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
3.87 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
3.87 miles
|
Amazon 22370 Kipper
|
|
3.87 miles
|
PowerHouse Pacific
|
|
3.87 miles
|
CloudHQ LC2
|
|
3.88 miles
|
Amazon 22420 Kipper
|
|
3.92 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
3.93 miles
|
Vantage VA12
|
|
3.94 miles
|
Sentinel Ashburn
|
|
3.94 miles
|
DataBank Ashburn IAD3
|
|
3.96 miles
|
AWS: 22868 International Dr
|
|
3.97 miles
|
InfoRelay Herndon
|
|
3.97 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
4.00 miles
|
Cyxtera IAD2-B
|
|
4.05 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
4.05 miles
|
Cyxtera IAD2-A
|
|
4.06 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
4.07 miles
|
Equinix DC21
|
|
4.07 miles
|
Vantage VA13
|
|
4.07 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
4.08 miles
|
NTT VA5
|
|
4.13 miles
|
21780 Filigree: Digital Realty
|
|
4.13 miles
|
Vantage VA11
|
|
4.13 miles
|
Equinix Ashburn DC5
|
|
4.13 miles
|
Equinix Ashburn DC11
|
|
4.13 miles
|
Equinix Ashburn DC6
|
|
4.14 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
4.15 miles
|
Equinix Ashburn DC1
|
|
4.16 miles
|
NTT Ashburn Campus
|
|
4.17 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
4.17 miles
|
VPLS IAD
|
|
4.18 miles
|
Equinix Ashburn DC4
|
|
4.20 miles
|
Vantage VA2 Campus
|
|
4.21 miles
|
Equinix Ashburn DC2
|
|
4.21 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
4.21 miles
|
NTT VA4
|
|
4.22 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
4.22 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
4.23 miles
|
H5 Ashburn
|
|
4.26 miles
|
AWS: 22900 Platform Plz
|
|
4.33 miles
|
ANEXIO Ashburn IAD4
|
|
4.33 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
4.35 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
4.40 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
4.41 miles
|
Rackspace Ashburn IAD3
|
|
4.41 miles
|
44461 Chilum (ACC6) Digital Realty
|
|
4.46 miles
|
Amazon 13600 EDS Drive
|
|
4.47 miles
|
44490 Chilum Place: Digital Realty
|
|
4.50 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
4.51 miles
|
44470 Chillum - Digital Realty
|
|
4.52 miles
|
ServerCentral Ashburn DC3
|
|
4.52 miles
|
Equinix Ashburn DC3
|
|
4.58 miles
|
PowerHouse ABX1
|
|
4.60 miles
|
Level 3 Ashburn
|
|
4.65 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
4.67 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
4.68 miles
|
AWS: 45950 Pathfinder Plz
|
|
4.69 miles
|
ANEXIO VA1
|
|
4.69 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
4.69 miles
|
Evoque Ashburn WDC1
|
|
4.73 miles
|
21710 Charles View
|
|
4.77 miles
|
NTT VA2
|
|
4.78 miles
|
Equinix DC15
|
|
4.78 miles
|
45900 Pathfinder Plz
|
|
4.80 miles
|
Amazon IAD9
|
|
4.84 miles
|
AWS: 45930 Pathfinder Plz
|
|
4.85 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
4.86 miles
|
Amazon IAD22
|
|
4.89 miles
|
21641 Charles View
|
|
4.90 miles
|
Amazon IAD1
|
|
4.98 miles
|
Amazon 44862 Interconnection Plaza
|
|
5.01 miles
|
Amazon IAD71
|
|
5.02 miles
|
Amazon IAD60
|
|
5.02 miles
|
Amazon 44858 Interconnection Plaza
|
|
5.04 miles
|
Amazon IAD50
|
|
5.07 miles
|
Amazon 44854 Interconnection
|
|
5.10 miles
|
Amazon 45305 Severn
|
|
5.13 miles
|
Amazon 45259 Severn
|
|
5.20 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
5.20 miles
|
Amazon IAD32
|
|
5.29 miles
|
Amazon IAD10
|
|
5.39 miles
|
CyrusOne Northern Virginia Sterling V
|
|
5.65 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
5.69 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
5.84 miles
|
COPT: 45761 Maries Rd
|
|
5.86 miles
|
COPT: 45751 Maries Rd
|
|
5.88 miles
|
EdgeCore Ashburn
|
|
5.95 miles
|
CyrusOne Sterling VIII
|
|
6.01 miles
|
Cyxtera Sterling DC3
|
|
6.01 miles
|
Lincoln Rackhouse 251 Exchange
|
|
6.05 miles
|
Level3 Washington (Herndon 1)
|
|
6.06 miles
|
Cyxtera Sterling DC2
|
|
6.08 miles
|
Cogent: 510 Huntmar
|
|
6.12 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
6.14 miles
|
Compass Loudoun County
|
|
6.16 miles
|
Amazon IAD-69
|
|
6.16 miles
|
Cyxtera Sterling DC4
|
|
6.17 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
6.24 miles
|
Equinix DC97
|
|
6.52 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
6.61 miles
|
Level3 Reston 1
|
|
6.64 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
6.77 miles
|
Google Leesburg Stonewall Park
|
|
6.96 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
6.96 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
8.06 miles
|
InfoRelay Reston
|
|
8.19 miles
|
Vantage VA3 Campus
|
|
8.69 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
8.86 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
8.98 miles
|
ANEXIO Reston
|
|
8.98 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
9.20 miles
|
Microsoft Leesburg 1A
|
|
10.88 miles
|
AOL: 7777 Infantry Ridge
|
|
10.99 miles
|
Equinix Manassas DC14
|
|
11.95 miles
|
Amazon 7500 Bethlehem
|
|
12.02 miles
|
Amazon IAD7
|
|
12.04 miles
|
Amazon IAD24
|
|
12.08 miles
|
Amazon IAD-59
|
|
12.10 miles
|
Amazon IAD11
|
|
12.14 miles
|
Corscale: Gainesville Crossing
|
|
12.15 miles
|
Amazon IAD-52
|
|
12.23 miles
|
Amazon IAD14
|
|
12.78 miles
|
Amazon: 8190 Bethlehem
|
|
12.81 miles
|
NTT Gainesville VA Campus
|
|
12.85 miles
|
Amazon Bethlehem Technology Park DC20
|
|
12.87 miles
|
Amazon Bethlehem Technology Park DC19
|
|
12.88 miles
|
Amazon Bethlehem Technology Park DC18
|
|
12.96 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
13.02 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
13.07 miles
|
Iron Mountain VA-2
|
|
13.11 miles
|
Amazon IAD-55
|
|
13.17 miles
|
Amazon IAD-73
|
|
13.19 miles
|
Amazon IAD-74
|
|
13.21 miles
|
Amazon: 15455 John Marshall
|
|
13.27 miles
|
Opus Interactive Manassas
|
|
13.28 miles
|
Amazon 15465 John Marshall
|
|
13.55 miles
|
Yondr Bristow Campus
|
|
13.82 miles
|
Equinix Vienna DC8
|
|
13.91 miles
|
9020 Freedom Center
|
|
13.97 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
13.98 miles
|
9040 Freedom Center
|
|
14.35 miles
|
QTS Manassas DC1
|
|
14.39 miles
|
QTS Manassas DC5
|
|
14.60 miles
|
QTS 10680 University Blvd
|
|
14.69 miles
|
Cogent Vienna
|
|
14.75 miles
|
8100 Boone - Digital Realty
|
|
14.85 miles
|
XO Fairfax
|
|
14.94 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
14.94 miles
|
Evoswitch USA WDC 1
|
|
14.94 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
14.94 miles
|
Amazon IAD-77
|
|
15.12 miles
|
Equinix Vienna DC7
|
|
15.16 miles
|
Amazon: 11150 Thomasson Barn
|
|
15.17 miles
|
Element Critical VA1
|
|
15.18 miles
|
Amazon: 11200 Thomasson Barn
|
|
15.38 miles
|
DataBank McLean IAD2
|
|
15.39 miles
|
Level3 McLean 1
|
|
15.52 miles
|
AWS 10261 Tanner
|
|
15.62 miles
|
AWS IAD 101
|
|
15.65 miles
|
AWS 10281 Tanner Way
|
|
15.74 miles
|
AWS IAD 100
|
|
16.50 miles
|
CloudHQ MCC2
|
|
16.77 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|