0.29 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
0.47 miles
|
CloudHQ MCC3
|
|
0.86 miles
|
AWS IAD 100
|
|
0.90 miles
|
AWS 10281 Tanner Way
|
|
0.96 miles
|
AWS IAD 101
|
|
1.02 miles
|
AWS 10261 Tanner
|
|
2.13 miles
|
QTS 10680 University Blvd
|
|
2.17 miles
|
Amazon: 11150 Thomasson Barn
|
|
2.21 miles
|
Amazon: 11200 Thomasson Barn
|
|
2.31 miles
|
QTS Manassas DC1
|
|
2.44 miles
|
Amazon IAD-77
|
|
2.44 miles
|
Evoswitch USA WDC 1
|
|
2.44 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
2.44 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
2.45 miles
|
QTS Manassas DC5
|
|
2.80 miles
|
9040 Freedom Center
|
|
2.84 miles
|
9020 Freedom Center
|
|
4.31 miles
|
Opus Interactive Manassas
|
|
4.40 miles
|
Amazon Bethlehem Technology Park DC18
|
|
4.51 miles
|
Iron Mountain VA-2
|
|
4.51 miles
|
Amazon Bethlehem Technology Park DC19
|
|
4.55 miles
|
Amazon: 8190 Bethlehem
|
|
4.58 miles
|
Amazon Bethlehem Technology Park DC20
|
|
4.60 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
4.91 miles
|
Amazon IAD-74
|
|
4.99 miles
|
Amazon IAD-73
|
|
5.16 miles
|
Amazon 7500 Bethlehem
|
|
5.16 miles
|
Amazon IAD7
|
|
5.17 miles
|
Amazon IAD11
|
|
5.19 miles
|
Amazon IAD24
|
|
5.33 miles
|
Amazon IAD14
|
|
5.40 miles
|
Amazon IAD-52
|
|
5.48 miles
|
Amazon IAD-59
|
|
5.58 miles
|
Equinix Manassas DC14
|
|
5.70 miles
|
AOL: 7777 Infantry Ridge
|
|
5.91 miles
|
Yondr Bristow Campus
|
|
6.37 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
6.50 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
6.97 miles
|
Corscale: Gainesville Crossing
|
|
8.12 miles
|
NTT Gainesville VA Campus
|
|
9.60 miles
|
OVH US East Vint Hill
|
|
10.25 miles
|
Amazon IAD-55
|
|
10.46 miles
|
Amazon: 15455 John Marshall
|
|
10.46 miles
|
Amazon 15465 John Marshall
|
|
12.32 miles
|
Amazon IAD22
|
|
12.33 miles
|
Amazon IAD1
|
|
12.46 miles
|
Amazon IAD9
|
|
13.00 miles
|
Lafayette Center Drive Campus - Digital Realty
|
|
13.05 miles
|
IBM Softlayer Chantilly WDC01
|
|
13.29 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
13.30 miles
|
Amazon IAD61
|
|
13.37 miles
|
Amazon 25410 Sutton Bay
|
|
13.44 miles
|
Amazon IAD-63
|
|
13.45 miles
|
Amazon 25420 Sutton Bay
|
|
13.50 miles
|
Amazon Prediction Lane
|
|
13.77 miles
|
Amazon Willard Road (Land)
|
|
13.77 miles
|
Amazon 25020 Willard Road
|
|
14.32 miles
|
Amazon 13600 EDS Drive
|
|
15.10 miles
|
InfoRelay Herndon
|
|
15.21 miles
|
Google: Arcola 2
|
|
15.35 miles
|
PowerHouse Arcola
|
|
15.48 miles
|
Google Dulles Arcola Center
|
|
15.58 miles
|
Amazon 41992 John Mosby Highway
|
|
15.61 miles
|
Amazon Fadeley II
|
|
15.69 miles
|
Amazon Fadeley III
|
|
15.72 miles
|
Amazon Fadeley I
|
|
15.93 miles
|
Yondr Arcola, VA
|
|
16.14 miles
|
Microsoft Aldie
|
|
16.22 miles
|
CyrusOne Sterling IX
|
|
16.50 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
16.65 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
16.99 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
17.01 miles
|
Level3 Reston 1
|
|
17.26 miles
|
XO Fairfax
|
|
17.31 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
17.31 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
17.34 miles
|
Lincoln Rackhouse 251 Exchange
|
|
17.75 miles
|
Equinix DC97
|
|
17.75 miles
|
Cogent: 510 Huntmar
|
|
17.91 miles
|
InfoRelay Reston
|
|
17.96 miles
|
Level3 Washington (Herndon 1)
|
|
18.05 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
18.07 miles
|
Cyxtera Sterling DC7
|
|
18.08 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
18.12 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
18.12 miles
|
ANEXIO Reston
|
|
18.29 miles
|
AWS: 22945 International Dr
|
|
18.37 miles
|
AWS: 22868 International Dr
|
|
18.45 miles
|
Amazon IAD-58
|
|
18.47 miles
|
Cyxtera IAD2-B
|
|
18.47 miles
|
AWS: 22900 Platform Plz
|
|
18.49 miles
|
Cyxtera IAD2-A
|
|
18.51 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
18.53 miles
|
Amazon IAD-57
|
|
18.58 miles
|
Amazon IAD12
|
|
18.60 miles
|
Skybox Northern Virginia
|
|
18.69 miles
|
Amazon IAD16
|
|
18.77 miles
|
Amazon IAD15
|
|
18.78 miles
|
Amazon IAD-88
|
|
18.79 miles
|
Amazon IAD-56
|
|
18.80 miles
|
Amazon 45111 Loudoun Downs
|
|
18.85 miles
|
45900 Pathfinder Plz
|
|
18.86 miles
|
Amazon IAD-51
|
|
18.87 miles
|
44351 Import Plz
|
|
18.91 miles
|
Amazon IAD76
|
|
18.92 miles
|
AWS: 45950 Pathfinder Plz
|
|
18.92 miles
|
Import Plz, Ashburn
|
|
18.95 miles
|
AWS: 45930 Pathfinder Plz
|
|
18.95 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
18.99 miles
|
QTS Ashburn Lockridge
|
|
19.00 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
19.03 miles
|
QTS Ashburn-Shellhorn
|
|
19.10 miles
|
QTS Ashburn-Shellhorn DC2
|
|
19.11 miles
|
Amazon 22420 Kipper
|
|
19.15 miles
|
Amazon 22370 Kipper
|
|
19.23 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
19.23 miles
|
Amazon IAD-67
|
|
19.29 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
19.30 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
19.30 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
19.30 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
19.30 miles
|
43881 Devin Shafron (Bldg B)
|
|
19.33 miles
|
Vantage VA2 Campus
|
|
19.34 miles
|
43831 Devin Shafron (Bldg C)
|
|
19.36 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
19.36 miles
|
43915 Devin Shafron (Bldg A)
|
|
19.38 miles
|
Amazon IAD-54
|
|
19.38 miles
|
43791 Devin Shafron (Bldg D)
|
|
19.43 miles
|
Digital Realty: IAD43
|
|
19.44 miles
|
Vantage VA12
|
|
19.45 miles
|
Sentinel Ashburn
|
|
19.45 miles
|
43830 Devin Shafron (Bldg F)
|
|
19.50 miles
|
43790 Devin Shafron (Bldg E)
|
|
19.51 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
19.61 miles
|
Vantage VA11
|
|
19.61 miles
|
Vantage VA13
|
|
19.66 miles
|
PowerHouse Pacific
|
|
19.66 miles
|
Cogent Vienna
|
|
19.66 miles
|
Digital Realty: Broderick Drive
|
|
19.72 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
19.74 miles
|
Equinix Vienna DC7
|
|
19.75 miles
|
44372 Round Table: Digital Realty
|
|
19.76 miles
|
8100 Boone - Digital Realty
|
|
19.76 miles
|
Element Critical VA1
|
|
19.78 miles
|
44274 Round Table (Bldg L)
|
|
19.86 miles
|
44751 Round Table (Bldg P)
|
|
19.91 miles
|
Aligned IAD02
|
|
19.95 miles
|
CloudHQ Ashburn Campus
|
|
19.96 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
19.97 miles
|
Equinix DC13
|
|