0.08 miles
|
Amazon IAD-74
|
|
0.64 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
0.70 miles
|
Iron Mountain VA-2
|
|
0.80 miles
|
Opus Interactive Manassas
|
|
0.88 miles
|
Amazon Bethlehem Technology Park DC20
|
|
0.95 miles
|
Amazon Bethlehem Technology Park DC19
|
|
1.01 miles
|
Amazon IAD14
|
|
1.01 miles
|
Amazon: 8190 Bethlehem
|
|
1.07 miles
|
Amazon IAD-52
|
|
1.09 miles
|
Amazon Bethlehem Technology Park DC18
|
|
1.12 miles
|
Amazon IAD-59
|
|
1.27 miles
|
Yondr Bristow Campus
|
|
1.31 miles
|
Amazon IAD11
|
|
1.38 miles
|
Amazon IAD24
|
|
1.45 miles
|
Amazon IAD7
|
|
1.58 miles
|
Amazon 7500 Bethlehem
|
|
1.60 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
1.97 miles
|
Corscale: Gainesville Crossing
|
|
1.99 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
2.48 miles
|
9040 Freedom Center
|
|
2.49 miles
|
9020 Freedom Center
|
|
2.58 miles
|
Evoswitch USA WDC 1
|
|
2.58 miles
|
Amazon IAD-77
|
|
2.58 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
2.58 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
2.65 miles
|
QTS Manassas DC5
|
|
2.83 miles
|
Amazon: 11200 Thomasson Barn
|
|
2.85 miles
|
Amazon: 11150 Thomasson Barn
|
|
2.96 miles
|
QTS Manassas DC1
|
|
3.01 miles
|
QTS 10680 University Blvd
|
|
3.13 miles
|
Equinix Manassas DC14
|
|
3.13 miles
|
AOL: 7777 Infantry Ridge
|
|
3.25 miles
|
NTT Gainesville VA Campus
|
|
4.08 miles
|
AWS IAD 101
|
|
4.10 miles
|
AWS 10261 Tanner
|
|
4.16 miles
|
AWS IAD 100
|
|
4.18 miles
|
AWS 10281 Tanner Way
|
|
4.99 miles
|
CloudHQ MCC2
|
|
5.26 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
5.42 miles
|
CloudHQ MCC3
|
|
5.44 miles
|
Amazon IAD-55
|
|
5.66 miles
|
Amazon: 15455 John Marshall
|
|
5.67 miles
|
Amazon 15465 John Marshall
|
|
6.56 miles
|
OVH US East Vint Hill
|
|
10.00 miles
|
Amazon IAD22
|
|
10.03 miles
|
Amazon IAD1
|
|
10.15 miles
|
Amazon IAD9
|
|
10.15 miles
|
Amazon IAD61
|
|
10.25 miles
|
Lafayette Center Drive Campus - Digital Realty
|
|
10.26 miles
|
Amazon IAD-63
|
|
10.28 miles
|
Amazon Prediction Lane
|
|
10.29 miles
|
IBM Softlayer Chantilly WDC01
|
|
10.39 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
10.42 miles
|
Amazon 25410 Sutton Bay
|
|
10.54 miles
|
Amazon 25420 Sutton Bay
|
|
10.75 miles
|
Amazon 25020 Willard Road
|
|
10.75 miles
|
Amazon Willard Road (Land)
|
|
11.45 miles
|
Google: Arcola 2
|
|
11.49 miles
|
PowerHouse Arcola
|
|
11.56 miles
|
Amazon 41992 John Mosby Highway
|
|
11.72 miles
|
Google Dulles Arcola Center
|
|
11.95 miles
|
Amazon Fadeley II
|
|
12.00 miles
|
Amazon Fadeley III
|
|
12.01 miles
|
Microsoft Aldie
|
|
12.06 miles
|
Amazon Fadeley I
|
|
12.09 miles
|
Yondr Arcola, VA
|
|
12.24 miles
|
Amazon 13600 EDS Drive
|
|
12.75 miles
|
CyrusOne Sterling IX
|
|
12.89 miles
|
InfoRelay Herndon
|
|
13.17 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
14.75 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
15.33 miles
|
Cyxtera Sterling DC7
|
|
15.45 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
15.49 miles
|
Level3 Reston 1
|
|
15.60 miles
|
Lincoln Rackhouse 251 Exchange
|
|
15.71 miles
|
Amazon IAD-58
|
|
15.73 miles
|
44351 Import Plz
|
|
15.75 miles
|
Import Plz, Ashburn
|
|
15.75 miles
|
Amazon IAD12
|
|
15.75 miles
|
Skybox Northern Virginia
|
|
15.76 miles
|
AWS: 22945 International Dr
|
|
15.78 miles
|
Amazon IAD-57
|
|
15.84 miles
|
QTS Ashburn-Shellhorn
|
|
15.85 miles
|
Amazon IAD16
|
|
15.86 miles
|
AWS: 22868 International Dr
|
|
15.86 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
15.86 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
15.91 miles
|
Amazon IAD15
|
|
15.92 miles
|
QTS Ashburn-Shellhorn DC2
|
|
15.95 miles
|
Cyxtera IAD2-B
|
|
15.98 miles
|
Cogent: 510 Huntmar
|
|
15.98 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
15.98 miles
|
Amazon IAD-67
|
|
15.98 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
15.99 miles
|
Cyxtera IAD2-A
|
|
16.01 miles
|
Amazon IAD-88
|
|
16.01 miles
|
43881 Devin Shafron (Bldg B)
|
|
16.01 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
16.02 miles
|
43831 Devin Shafron (Bldg C)
|
|
16.02 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
16.02 miles
|
Equinix DC97
|
|
16.03 miles
|
Amazon IAD76
|
|
16.03 miles
|
QTS Ashburn Lockridge
|
|
16.04 miles
|
Amazon IAD-54
|
|
16.04 miles
|
43791 Devin Shafron (Bldg D)
|
|
16.04 miles
|
Amazon 45111 Loudoun Downs
|
|
16.04 miles
|
AWS: 22900 Platform Plz
|
|
16.06 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
16.06 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
16.06 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
16.08 miles
|
43915 Devin Shafron (Bldg A)
|
|
16.09 miles
|
Amazon IAD-56
|
|
16.10 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
16.14 miles
|
43830 Devin Shafron (Bldg F)
|
|
16.14 miles
|
Level3 Washington (Herndon 1)
|
|
16.16 miles
|
Amazon IAD-51
|
|
16.17 miles
|
43790 Devin Shafron (Bldg E)
|
|
16.40 miles
|
Amazon 22420 Kipper
|
|
16.43 miles
|
Amazon 22370 Kipper
|
|
16.47 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
16.48 miles
|
Digital Realty: IAD43
|
|
16.49 miles
|
45900 Pathfinder Plz
|
|
16.52 miles
|
AWS: 45950 Pathfinder Plz
|
|
16.59 miles
|
AWS: 45930 Pathfinder Plz
|
|
16.59 miles
|
44372 Round Table: Digital Realty
|
|
16.64 miles
|
44274 Round Table (Bldg L)
|
|
16.65 miles
|
Vantage VA12
|
|
16.66 miles
|
Sentinel Ashburn
|
|
16.67 miles
|
Vantage VA2 Campus
|
|
16.69 miles
|
Aligned IAD02
|
|
16.70 miles
|
InfoRelay Reston
|
|
16.74 miles
|
Digital Realty: Broderick Drive
|
|
16.74 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
16.77 miles
|
PowerHouse Pacific
|
|
16.78 miles
|
Equinix DC13
|
|
16.82 miles
|
Vantage VA13
|
|
16.82 miles
|
44751 Round Table (Bldg P)
|
|
16.84 miles
|
Vantage VA11
|
|
16.86 miles
|
CloudHQ Ashburn Campus
|
|
16.88 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
16.90 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
16.94 miles
|
Databank Ashburn IAD1
|
|
16.96 miles
|
FastServ Ashburn
|
|
16.99 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
17.00 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
17.00 miles
|
CloudHQ LC2
|
|
17.01 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
17.01 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
17.07 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
17.09 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
17.09 miles
|
DataBank Ashburn IAD3
|
|
17.12 miles
|
Equinix DC21
|
|
17.16 miles
|
ANEXIO Reston
|
|
17.16 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
17.21 miles
|
21780 Filigree: Digital Realty
|
|
17.23 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
17.24 miles
|
Equinix Ashburn DC6
|
|
17.24 miles
|
Equinix Ashburn DC11
|
|
17.25 miles
|
NTT VA5
|
|
17.26 miles
|
Equinix Ashburn DC5
|
|
17.27 miles
|
VPLS IAD
|
|
17.27 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
17.27 miles
|
Equinix Ashburn DC1
|
|
17.27 miles
|
H5 Ashburn
|
|
17.28 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
17.29 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
17.31 miles
|
Equinix Ashburn DC4
|
|
17.32 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
17.32 miles
|
Equinix Ashburn DC2
|
|
17.33 miles
|
NTT Ashburn Campus
|
|
17.37 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
17.37 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
17.38 miles
|
NTT VA4
|
|
17.47 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
17.47 miles
|
ANEXIO Ashburn IAD4
|
|
17.50 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
17.53 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
17.56 miles
|
Rackspace Ashburn IAD3
|
|
17.56 miles
|
44461 Chilum (ACC6) Digital Realty
|
|
17.61 miles
|
44490 Chilum Place: Digital Realty
|
|
17.62 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
17.65 miles
|
PowerHouse ABX1
|
|
17.65 miles
|
21710 Charles View
|
|
17.65 miles
|
44470 Chillum - Digital Realty
|
|
17.66 miles
|
Equinix Ashburn DC3
|
|
17.66 miles
|
ServerCentral Ashburn DC3
|
|
17.73 miles
|
Level 3 Ashburn
|
|
17.75 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
17.79 miles
|
Evoque Ashburn WDC1
|
|
17.80 miles
|
ANEXIO VA1
|
|
17.80 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
17.83 miles
|
21641 Charles View
|
|
17.85 miles
|
Equinix DC15
|
|
17.91 miles
|
NTT VA2
|
|
17.93 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
17.97 miles
|
Amazon 45305 Severn
|
|
18.02 miles
|
Amazon 45259 Severn
|
|
18.10 miles
|
Amazon 44862 Interconnection Plaza
|
|
18.11 miles
|
Amazon IAD32
|
|
18.12 miles
|
Amazon 44858 Interconnection Plaza
|
|
18.15 miles
|
Amazon 44854 Interconnection
|
|
18.16 miles
|
Amazon IAD71
|
|
18.16 miles
|
Amazon IAD60
|
|
18.17 miles
|
Amazon IAD10
|
|
18.19 miles
|
Amazon IAD50
|
|
18.26 miles
|
XO Fairfax
|
|
18.31 miles
|
CyrusOne Northern Virginia Sterling V
|
|
18.39 miles
|
Compass Loudoun County
|
|
18.53 miles
|
CyrusOne Sterling VIII
|
|
18.55 miles
|
COPT: 45761 Maries Rd
|
|
18.61 miles
|
COPT: 45751 Maries Rd
|
|
18.66 miles
|
Cyxtera Sterling DC3
|
|
18.67 miles
|
Cyxtera Sterling DC2
|
|
18.77 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
18.78 miles
|
Cyxtera Sterling DC4
|
|
18.78 miles
|
EdgeCore Ashburn
|
|
18.79 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
18.80 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
18.81 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
18.83 miles
|
Amazon IAD-69
|
|
18.96 miles
|
Google Leesburg Stonewall Park
|
|
19.78 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|