0.07 miles
|
Amazon: 11200 Thomasson Barn
|
|
0.28 miles
|
Amazon IAD-77
|
|
0.28 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
0.28 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
0.28 miles
|
Evoswitch USA WDC 1
|
|
0.86 miles
|
QTS Manassas DC5
|
|
0.89 miles
|
QTS 10680 University Blvd
|
|
1.12 miles
|
QTS Manassas DC1
|
|
1.24 miles
|
9040 Freedom Center
|
|
1.33 miles
|
9020 Freedom Center
|
|
1.36 miles
|
AWS IAD 101
|
|
1.40 miles
|
AWS IAD 100
|
|
1.43 miles
|
AWS 10261 Tanner
|
|
1.46 miles
|
AWS 10281 Tanner Way
|
|
2.17 miles
|
CloudHQ MCC2
|
|
2.24 miles
|
Opus Interactive Manassas
|
|
2.43 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
2.45 miles
|
Amazon Bethlehem Technology Park DC18
|
|
2.46 miles
|
Iron Mountain VA-2
|
|
2.53 miles
|
Amazon Bethlehem Technology Park DC19
|
|
2.54 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
2.57 miles
|
CloudHQ MCC3
|
|
2.58 miles
|
Amazon Bethlehem Technology Park DC20
|
|
2.59 miles
|
Amazon: 8190 Bethlehem
|
|
2.78 miles
|
Amazon IAD-74
|
|
2.85 miles
|
Amazon IAD-73
|
|
3.27 miles
|
Amazon IAD11
|
|
3.29 miles
|
Amazon IAD7
|
|
3.30 miles
|
Amazon IAD24
|
|
3.33 miles
|
Amazon 7500 Bethlehem
|
|
3.33 miles
|
Amazon IAD14
|
|
3.41 miles
|
Amazon IAD-52
|
|
3.49 miles
|
Amazon IAD-59
|
|
3.74 miles
|
Yondr Bristow Campus
|
|
4.21 miles
|
Equinix Manassas DC14
|
|
4.23 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
4.30 miles
|
AOL: 7777 Infantry Ridge
|
|
4.33 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
4.82 miles
|
Corscale: Gainesville Crossing
|
|
5.95 miles
|
NTT Gainesville VA Campus
|
|
7.84 miles
|
OVH US East Vint Hill
|
|
8.09 miles
|
Amazon IAD-55
|
|
8.29 miles
|
Amazon: 15455 John Marshall
|
|
8.30 miles
|
Amazon 15465 John Marshall
|
|
11.35 miles
|
Amazon IAD22
|
|
11.37 miles
|
Amazon IAD1
|
|
11.50 miles
|
Amazon IAD9
|
|
11.87 miles
|
Lafayette Center Drive Campus - Digital Realty
|
|
11.91 miles
|
IBM Softlayer Chantilly WDC01
|
|
12.01 miles
|
Amazon IAD61
|
|
12.10 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
12.13 miles
|
Amazon IAD-63
|
|
12.16 miles
|
Amazon 25410 Sutton Bay
|
|
12.18 miles
|
Amazon Prediction Lane
|
|
12.26 miles
|
Amazon 25420 Sutton Bay
|
|
12.54 miles
|
Amazon 25020 Willard Road
|
|
12.54 miles
|
Amazon Willard Road (Land)
|
|
13.49 miles
|
Amazon 13600 EDS Drive
|
|
13.67 miles
|
Google: Arcola 2
|
|
13.77 miles
|
PowerHouse Arcola
|
|
13.94 miles
|
Amazon 41992 John Mosby Highway
|
|
13.95 miles
|
Google Dulles Arcola Center
|
|
14.12 miles
|
Amazon Fadeley II
|
|
14.19 miles
|
Amazon Fadeley III
|
|
14.23 miles
|
InfoRelay Herndon
|
|
14.23 miles
|
Amazon Fadeley I
|
|
14.37 miles
|
Yondr Arcola, VA
|
|
14.45 miles
|
Microsoft Aldie
|
|
14.82 miles
|
CyrusOne Sterling IX
|
|
15.16 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
15.93 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
16.43 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
16.45 miles
|
Level3 Reston 1
|
|
16.69 miles
|
Lincoln Rackhouse 251 Exchange
|
|
16.79 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
16.79 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
17.00 miles
|
Cyxtera Sterling DC7
|
|
17.09 miles
|
Cogent: 510 Huntmar
|
|
17.11 miles
|
Equinix DC97
|
|
17.28 miles
|
Level3 Washington (Herndon 1)
|
|
17.31 miles
|
AWS: 22945 International Dr
|
|
17.38 miles
|
Amazon IAD-58
|
|
17.40 miles
|
AWS: 22868 International Dr
|
|
17.46 miles
|
Amazon IAD-57
|
|
17.47 miles
|
Amazon IAD12
|
|
17.48 miles
|
Skybox Northern Virginia
|
|
17.50 miles
|
InfoRelay Reston
|
|
17.50 miles
|
Cyxtera IAD2-B
|
|
17.53 miles
|
Cyxtera IAD2-A
|
|
17.53 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
17.54 miles
|
AWS: 22900 Platform Plz
|
|
17.58 miles
|
Amazon IAD16
|
|
17.63 miles
|
44351 Import Plz
|
|
17.65 miles
|
Amazon IAD15
|
|
17.67 miles
|
Import Plz, Ashburn
|
|
17.70 miles
|
Amazon IAD-88
|
|
17.71 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
17.72 miles
|
Amazon 45111 Loudoun Downs
|
|
17.74 miles
|
Amazon IAD-56
|
|
17.77 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
17.77 miles
|
QTS Ashburn-Shellhorn
|
|
17.79 miles
|
Amazon IAD76
|
|
17.80 miles
|
XO Fairfax
|
|
17.81 miles
|
Amazon IAD-51
|
|
17.82 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
17.82 miles
|
ANEXIO Reston
|
|
17.83 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
17.83 miles
|
QTS Ashburn Lockridge
|
|
17.83 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
17.84 miles
|
QTS Ashburn-Shellhorn DC2
|
|
17.94 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
17.94 miles
|
Amazon IAD-67
|
|
17.95 miles
|
45900 Pathfinder Plz
|
|
17.99 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
18.00 miles
|
AWS: 45950 Pathfinder Plz
|
|
18.00 miles
|
43881 Devin Shafron (Bldg B)
|
|
18.02 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
18.02 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
18.02 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
18.02 miles
|
43831 Devin Shafron (Bldg C)
|
|
18.05 miles
|
AWS: 45930 Pathfinder Plz
|
|
18.05 miles
|
Amazon IAD-54
|
|
18.05 miles
|
43791 Devin Shafron (Bldg D)
|
|
18.06 miles
|
Amazon 22420 Kipper
|
|
18.06 miles
|
43915 Devin Shafron (Bldg A)
|
|
18.10 miles
|
Amazon 22370 Kipper
|
|
18.14 miles
|
43830 Devin Shafron (Bldg F)
|
|
18.18 miles
|
43790 Devin Shafron (Bldg E)
|
|
18.23 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
18.27 miles
|
Digital Realty: IAD43
|
|
18.30 miles
|
Vantage VA2 Campus
|
|
18.36 miles
|
Vantage VA12
|
|
18.36 miles
|
Sentinel Ashburn
|
|
18.43 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
18.51 miles
|
44372 Round Table: Digital Realty
|
|
18.52 miles
|
Digital Realty: Broderick Drive
|
|
18.53 miles
|
Vantage VA13
|
|
18.53 miles
|
Vantage VA11
|
|
18.54 miles
|
PowerHouse Pacific
|
|
18.54 miles
|
44274 Round Table (Bldg L)
|
|
18.62 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
18.64 miles
|
Aligned IAD02
|
|
18.67 miles
|
44751 Round Table (Bldg P)
|
|
18.71 miles
|
Equinix DC13
|
|
18.74 miles
|
CloudHQ Ashburn Campus
|
|
18.87 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
18.87 miles
|
CloudHQ LC2
|
|
18.90 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
18.92 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
18.93 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
18.94 miles
|
Databank Ashburn IAD1
|
|
18.95 miles
|
Equinix DC21
|
|
18.96 miles
|
FastServ Ashburn
|
|
18.96 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
18.97 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
19.06 miles
|
21780 Filigree: Digital Realty
|
|
19.09 miles
|
H5 Ashburn
|
|
19.10 miles
|
DataBank Ashburn IAD3
|
|
19.10 miles
|
Equinix Ashburn DC11
|
|
19.10 miles
|
Equinix Ashburn DC6
|
|
19.13 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
19.13 miles
|
VPLS IAD
|
|
19.14 miles
|
Equinix Ashburn DC5
|
|
19.14 miles
|
Equinix Ashburn DC1
|
|
19.16 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
19.19 miles
|
Equinix Ashburn DC2
|
|
19.19 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
19.19 miles
|
Equinix Ashburn DC4
|
|
19.20 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
19.20 miles
|
NTT VA5
|
|
19.26 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
19.26 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
19.27 miles
|
NTT Ashburn Campus
|
|
19.34 miles
|
NTT VA4
|
|
19.37 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
19.37 miles
|
ANEXIO Ashburn IAD4
|
|
19.39 miles
|
21710 Charles View
|
|
19.40 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
19.41 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
19.47 miles
|
44461 Chilum (ACC6) Digital Realty
|
|
19.47 miles
|
Rackspace Ashburn IAD3
|
|
19.47 miles
|
PowerHouse ABX1
|
|
19.48 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
19.49 miles
|
44490 Chilum Place: Digital Realty
|
|
19.54 miles
|
44470 Chillum - Digital Realty
|
|
19.55 miles
|
ServerCentral Ashburn DC3
|
|
19.55 miles
|
Equinix Ashburn DC3
|
|
19.58 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
19.58 miles
|
21641 Charles View
|
|
19.60 miles
|
Level 3 Ashburn
|
|
19.63 miles
|
Evoque Ashburn WDC1
|
|
19.65 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
19.65 miles
|
ANEXIO VA1
|
|
19.68 miles
|
Equinix DC15
|
|
19.68 miles
|
Amazon 45305 Severn
|
|
19.75 miles
|
Amazon 45259 Severn
|
|
19.75 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
19.78 miles
|
NTT VA2
|
|
19.84 miles
|
Amazon IAD32
|
|
19.89 miles
|
Amazon IAD10
|
|
19.95 miles
|
Amazon 44858 Interconnection Plaza
|
|
19.95 miles
|
Amazon 44862 Interconnection Plaza
|
|
19.98 miles
|
Amazon 44854 Interconnection
|
|